Company emissions

Power and heat: emissions by company in the EU ETS

547 Mt CO2e in 2025 from 4,604 power and heat installations in the EU ETS, run by 2,408 companies; 65 Mt of it covered by free allowances. Source: Arcadium Data, data as of .

Use it through the API License the full dataset

Largest operating companies

Operating companyInstallationsEmissions 2025Free allocationAllowances to buy
PGE Górnictwo i Energetyka Konwencjonalna S.A.543 Mt41 kt43 Mt
Lausitz Energie Kraftwerke AG739 Mt0.3 Mt39 Mt
RWE Power Aktiengesellschaft533 Mt0.1 Mt33 Mt
ENEA WYTWARZANIE SP. Z O.O.312 Mt4 kt12 Mt
ČEZ, a. s.1011 Mt0.1 Mt11 Mt
ΔΕΗ Α.Ε248.6 Mt13 kt8.6 Mt
TAURON WYTWARZANIE S.A.68.6 Mt36 kt8.5 Mt
Equinor ASA227.1 Mt1.6 Mt5.5 Mt
Vattenfall Power Generation Netherlands B.V.76.8 Mt48 kt6.8 Mt
U. S. Steel Košice, s.r.o.26.5 Mt6.1 Mt0.4 Mt
Electrabel176.5 Mt
EDISON SPA106.3 Mt34 kt6.2 Mt
Naturgy Ciclos Combinados, S.L.U.116.1 Mt
EniPower S.p.A.46.0 Mt15 kt6.0 Mt
ThyssenKrupp Steel Europe AG55.9 Mt50 kt5.9 Mt
EnBW Energie Baden-Württemberg AG85.8 Mt62 kt5.7 Mt
Sarlux Srl15.6 Mt2.1 Mt3.5 Mt
Uniper Kraftwerke GmbH165.6 Mt59 kt5.5 Mt
PGNiG TERMIKA S.A.45.1 Mt0.4 Mt4.6 Mt
Unión Eléctrica de Canarias Generación, S.A.U.115.0 Mt
S Complexul Energetic Oltenia SA34.6 Mt
ENEL PRODUZIONE S.p.A.154.3 Mt
Elektrárna Počerady, a.s.14.2 Mt1 kt4.2 Mt
Vattenfall Wärme Berlin Aktiengesellschaft184.0 Mt0.3 Mt3.7 Mt
Saale Energie GmbH14.0 Mt78 kt3.9 Mt

Largest installations

InstallationActivityCountryOperating companyEmissions 2025
PGE GiEK S.A. Oddział Elektrownia BełchatówCombustion of fuelsPolandPGE Górnictwo i Energetyka Konwencjonalna S.A.25 Mt
Kraftwerk NeurathCombustion of fuelsGermanyRWE Power Aktiengesellschaft12 Mt
Kraftwerk NiederaußemCombustion of fuelsGermanyRWE Power Aktiengesellschaft11 Mt
Kraftwerk JänschwaldeCombustion of fuelsGermanyLausitz Energie Kraftwerke AG9.6 Mt
Kraftwerk Schwarze PumpeCombustion of fuelsGermanyLausitz Energie Kraftwerke AG8.7 Mt
Kraftwerk WeisweilerCombustion of fuelsGermanyRWE Power Aktiengesellschaft8.3 Mt
ELEKTROWNIA KOZIENICECombustion of fuelsPolandENEA WYTWARZANIE SP. Z O.O.7.9 Mt
PGE GiEK S.A. Oddział Elektrownia TurówCombustion of fuelsPolandPGE Górnictwo i Energetyka Konwencjonalna S.A.7.8 Mt
Kraftwerk Boxberg Werk IVCombustion of fuelsGermanyLausitz Energie Kraftwerke AG7.4 Mt
Kraftwerk LippendorfCombustion of fuelsGermanyLausitz Energie Kraftwerke AG7.3 Mt
PGE GiEK S.A. Oddział Elektrownia OpoleCombustion of fuelsPolandPGE Górnictwo i Energetyka Konwencjonalna S.A.7.2 Mt
Kraftwerk Boxberg Werk IIICombustion of fuelsGermanyLausitz Energie Kraftwerke AG5.7 Mt
Sarlux SrlCombustion of fuelsItalySarlux Srl5.6 Mt
Electrabel - KnippegroenCombustion of fuelsBelgiumElectrabel4.8 Mt
U. S. Steel Košice, s.r.o.Combustion of fuelsSlovakiaU. S. Steel Košice, s.r.o.4.5 Mt
Elektrárna PočeradyCombustion of fuelsCzechiaElektrárna Počerady, a.s.4.2 Mt
Kraftwerk SchkopauCombustion of fuelsGermanySaale Energie GmbH4.0 Mt
Elektrownia Kozienice - blok energetyczny 11Combustion of fuelsPolandENEA WYTWARZANIE SP. Z O.O.3.9 Mt
Grosskraftwerk MannheimCombustion of fuelsGermanyGroßkraftwerk Mannheim Aktiengesellschaft3.8 Mt
Vattenfall Power VelsenCombustion of fuelsNetherlandsVattenfall Power Generation Netherlands B.V.3.7 Mt
TPP AES-3C Maritza East 1Combustion of fuelsBulgariaAES-3C Maritza East 13.7 Mt
RWE Eemshaven CentraleCombustion of fuelsNetherlandsRWE Eemshaven Holding II B.V.3.6 Mt
ČEZ, a. s. - Elektrárna Tušimice 2Combustion of fuelsCzechiaČEZ, a. s.3.3 Mt
ČEZ, a. s. - Elektrárna Prunéřov 2Combustion of fuelsCzechiaČEZ, a. s.3.3 Mt
ČEZ, a. s. - Elektrárna LedviceCombustion of fuelsCzechiaČEZ, a. s.3.2 Mt

By country

Emissions are verified EU Emissions Trading System emissions in tonnes of CO2 equivalent for 2025: the installations, aircraft operators and shipping companies covered by the ETS, not a company's total footprint (no scope 2 or 3, no sites outside the ETS). Free allocation is the free allowances allocated for the same year; "allowances to buy" is emissions minus free allocation, the exposure that grows as free allocation is phased out under CBAM from 2026. Companies only: an account holder that is not a company is never shown. Data as of 2026-10-25, updated yearly.

Emissions and allocation: European Commission, Union Registry of the EU ETS (verified emissions, free allocation, compliance and the list of operators; Commission reuse policy, CC BY 4.0). Parent company and pollutant releases of facilities: European Environment Agency, Industrial Emissions Portal (CC BY 4.0). Legal-entity identifiers: GLEIF (CC0).

Questions

Where does this data come from?

The European Commission publishes verified emissions, free allocation and compliance of every installation in the EU Emissions Trading System, and the list of operators with company registration number and LEI. We join them to the operating company, its website and its ultimate parent, and record changes each year.

Is this a full carbon footprint?

No. It covers emissions that fall under the EU ETS (power and heat, heavy industry, aviation within Europe, shipping). It has no scope 2 or scope 3 emissions and no sites outside the ETS.

Does the list show private persons?

No. Operators are shown only when they are companies. Account holders that could be natural persons are left out, and the data has no addresses or contact details.

Cite as: Arcadium Data, "Power and heat: emissions by company in the EU ETS: 547 Mt in 2025", https://arcadiumdata.io/emissions/sector/power-and-heat/, data as of 2026-10-25.